CombinedCyclePlantOptimization
CCPPFull O&M Takeover


The Situation
The facility needed a clearer operating rhythm across shift transitions, maintenance planning, and field execution. AMMA was engaged to establish practical controls that the permanent team could sustain.
Scope & Delivery Sequence
- Stabilization — baseline condition assessment and immediate safety boundaries.
- Execution — standard operating procedures, electronic logbooks, and permit-to-work discipline.
- Handover — structured training and transfer to the permanent site team.
Safety Controls
Safety verification checks were embedded into daily walkdowns and work authorization routines.
The Outcome
Stabilized the operating rhythm, maintenance discipline, and handover practices across a combined-cycle plant.